|
Overflow shuts
down lift station
Duluth
News Tribune - 1/17
A
broken force main caused a minimal sewer overflow in the Central
Hillside neighborhood of Duluth on Thursday. The overflow occurred
at the sewage lift station at 2915 N. Seventh Ave. E.
The
lift station has been shut down until the force main is fixed,
likely today. A small amount of sewage, about 8 gallons per hour,
escaped. Residents should avoid contact with any sewer overflow
because of the potential for exposure to disease-causing organisms.
Residents also are asked to report any overflow from manholes.
NOTICE: In accordance with Title
17 U.S.C., section 107, some material is provided without
permission from the copyright owner, only for purposes of
criticism, comment, scholarship and research under the "fair
use" provisions of federal copyright laws. These materials
may not be distributed further, except for "fair use,"
without permission of the copyright owner.
|